Trudian
North America market

Specify smart access for North American projects

For distributors, integrators and property teams in the United States, Canada and Mexico. Start with the site type, installed access equipment and the party responsible for installation and commissioning.

Project routing

Who is responsible for the project?

The buyer role changes the review. A distributor needs a supportable range; an integrator needs installation details; a property team needs an operating workflow that can be handed over at site.

Distributor & dealer

Confirm the target states, core models, first-line technical owner and the documents needed by the channel.

System integrator

Provide the controller topology, power and wiring information, credential method, acceptance test and handover point.

Property & project team

Share the building type, door or unit count, daily operating process and the party responsible for commissioning.

System scope

Select equipment against the installation

A country name does not determine the system. The entrance construction, credential method and control architecture determine which product family should be reviewed.

Video intercom systems

Door stations and indoor monitors for apartment, MDU and retrofit sites; review the entrance layout, wiring route and resident workflow.

Smart locks

Residential, managed-property and shared-area access; review door preparation, credential method and who administers access after handover.

Access control

Office, community and multi-door systems; review controller architecture, network ownership and the interface to the existing platform.

Technical fit

The details that change the equipment list

These conditions affect model selection, installation work and the documentation to be checked for the destination.

Building type

MDU, office, campus, community, managed rental or residential use.

Retrofit or new build

Existing door hardware, wiring routes and acceptable disruption during installation.

Power & network

Available power, cable paths, network ownership and permitted wireless use.

Credentials & handover

Credential mix, controller interface and the team that will run the system after handover.

Regional FAQ

Practical questions before specification

Not by default. Confirm the destination, SKU and deployment first. Importer responsibilities, wireless functions, documents, installation practice and building conditions can differ between the three markets.

Send the current controller or platform, topology, door count, credential method, wiring, power source, network owner and the agreed handover point.

Inquiry brief

What we need to price the project

1

Destination & buyer

Country or state, importer status and the buyer’s commercial role.

2

System scope

Product line, building type, doors or units and the installed interface.

3

Technical inputs

Power, network, credentials, requested documents and procurement window.

Commercial scope

Select standard, OEM or ODM based on the change required

Standard supply uses an existing configuration. OEM is appropriate when branding, packaging or selected documents need to change. ODM is for a jointly defined product that requires hardware, software or industrial-design work.

Starting quantities are 200 units for standard supply, 500 for OEM and 1,000 for ODM. Send the destination, application, product family, quantity and document requirements by WhatsApp or email. Final terms are confirmed against the selected SKU, customization and target market.